Tuesday, April 3, 2012

Thank You, Cory and Steve!

Today brings the finishing touches!
 Preparing for the baseboards
by shortening the existing trim.
 Measure twice, cut once.
 Figuring it out.
 Transition piece.
(AKA 3 guys and a geranium.)
 Clean up is the final step.

Now, I'll be silent while you scroll though the photos
of the beautiful floors!





Meanwhile, what's going on outside?

As the snow accumulates...


Thanks for a job well done, guys!


Now, for some target practice!






Snow in April?
Yes, and lots of it!






Dinner this evening:
Salmon cooked over an oak fire
Roasted Brocolli
Parmesan CousCous
Broiled Tomatoes
Tres Leches Cake


And the snow just keeps on falling...

9 1/2 " at 6pm 


A beautiful evening!
But, our electricity went out around 8:30.

Early morning, we had power for a while,
but it went out again before daylight
and didn't come on before we left.
The total snowfall as we left was almost 13"!







A couple of trees laden with snow
had to be pulled aside by Steve and Cory so we could get by!
Please overlook the trash bags in the back of the truck.
By the way, it was a 3 bag weekend,
not to mention the 30 flooring boxes that were burned
or the old carpet left behind for a future trip to the dump!



No comments:

Post a Comment